F-01

Sealing the foundation slab — transition to the wall

Foundation slab details

Drawings

  1. Construction detail with Besamembran waterproofing at the slab-to-wall transition

Components

  1. 1Floor layers
  2. 2Thermal insulation
  3. 3Seal
  4. 4Base layer
  5. 5Besamembran waterproofing / BesaPro moisture protection
  6. 6Lean concrete
  7. 7Seam
  8. 8Foundation wall
  9. 9Besamembran waterproofing / BesaPro moisture protection

Drawing preview

Unaltered page from the BESAMEMBRAN Product Data Sheet 2026 (EN).

Other details in this series

Source: BESAMEMBRAN Product Data Sheet 2026 (EN)