P-04

Execution of the interior corners

Corners

Drawings

  1. Drawing 1. Step 1 – cutting out a right-angled triangle
  2. Drawing 2. Step 2 – sticking the APP150 tape at a 45° angle
  3. Drawing 3. Step 3 – folding the membrane corner and sticking the APP150 tape onto the joint

Components

  1. 1Besamembran waterproofing membrane
  2. 2APP150-tape

Drawing preview

Unaltered page from the BESAMEMBRAN Product Data Sheet 2026 (EN).

Note: The corner connections must be made in accordance with drawing P-01 – cross connections.

Other details in this series

Source: BESAMEMBRAN Product Data Sheet 2026 (EN)